Alternate title - Big Cat on the Beach. The rain and wind are keeping me from flying the drone to show the current status and work in the Sharp Park area, so I went out with my iPhone to get some of what they’re doing. As shown in some of my drone livestreams, the ocean has built a really nice sand ramp up to the sea wall, making it almost effortless to get up-and-over the wall. The crews were out trying to fix that. They’re moving the sand away from the wall, building a little bit of a sand berm, and also uncovering a lot of the rock riprap that had been buried. They’ve also gotten deliveries of new rock riprap that they will be placing. Hopefully this helps a bit with the waves coming over the wall.