Pacifica Pier Work 10/20/26

The crews have been out doing a bit of work for the past week or so, which has mostly been making, filling and smoothing holes in Beach Blvd.  I’m sure there’s more to it, but that’s all I could see.  :-) This morning they started staging a fair bit of material so I thought I’d do some filming.  Rusty Red-tailed was with me keeping an eye on things too. 

Next
Next

Bottlenose Dolphins Organized Chaos, Pacifica 10/16/26